847
edits
Line 119: | Line 119: | ||
You can then start the processing to calculate the indicators. | You can then start the processing to calculate the indicators. | ||
Once completed, the result can be find the currently opened project in the [[NVGate Project manager]]. A new measurement called "NAME_OF_THE_Signal_out" containing the result is created.<br><br> | Once completed, the result can be find the currently opened project in the [[NVGate Project manager]]. A new measurement called "NAME_OF_THE_Signal_out" containing the result is created. As many measurement folder as selected signal will be created during the processing. <br><br> | ||
[[Image:Project_Manager_results.png]] | [[Image:Project_Manager_results.png]] | ||
Each indicator is calculated for each direction and for each track of the signal. The name of the result contain the name of the track, the considered direction and the filter used for that direction (except for the <math>D_k</math> which use specific filters). The following picture show the indicators for the first track (seatpad_X) of the signal : | |||
[[Image:Result_for_track.png]] | |||
==Calculating the other indicators with NVGate== | ==Calculating the other indicators with NVGate== |
edits