847
edits
Line 109: | Line 109: | ||
====In the toolkit==== | ====In the toolkit==== | ||
Before calculating the indicators in the toolkit, you must define a filter for each directions. Filters will be selected in accordance with the wanted result (Hand-arms; Whole-Body, ..) and the direction of the measurement as specified in the table [[Human_Vibration#Time-weighting_filters|describing the filters]]. Filters will be applied to the signal before calculating the indicators, but the time-filtered signal will not be saved. <br> | Before calculating the indicators in the toolkit, you must define a filter for each directions. Filters will be selected in accordance with the wanted result (Hand-arms; Whole-Body, ..) and the direction of the measurement as specified in the table [[Human_Vibration#Time-weighting_filters|describing the filters]]. Filters will be applied to the signal before calculating the indicators, but the time-filtered signal will not be saved. <br><br> | ||
[[Image:Processing_Filter.png]] | [[Image:Processing_Filter.png]] | ||
Line 115: | Line 115: | ||
[[Image:Selected_Processing.png]] | [[Image:Selected_Processing.png]] | ||
The MTVV Tau is the integration time in seconds used for the calculation of the MTVV. The ISO 2651 recommand to use 1sec. This is the default value of the setting. | The MTVV Tau is the integration time in seconds used for the calculation of the MTVV. The ISO 2651 recommand to use 1sec. This is the default value of the setting.<br> | ||
You can then start the processing to calculate the indicators. | |||
Once completed, the result can be find the currently opened project in the [[NVGate Project manager]]. A new measurement called "NAME_OF_THE_Signal_out" containing the result is created.<br><br> | |||
[[Image:Project_Manager_Results.png]] | |||
==Calculating the other indicators with NVGate== | ==Calculating the other indicators with NVGate== |
edits