|
|
Line 359: |
Line 359: |
|
| |
|
| [[Image:Project_Manager_User_Pref2_56.png|framed|none]] | | [[Image:Project_Manager_User_Pref2_56.png|framed|none]] |
|
| |
| =====New project=====
| |
| This command opens the following dialog box. (select Project tab)
| |
|
| |
| [[Image:Project_Manager_User_Pref2_57.png|framed|none]]
| |
|
| |
| * '''Create new''': Launche the following dialog box and start a setup wizard according to the following choices:
| |
| * '''On line''' Guide the user along the setup of an on-line & real-time analysis/recording. The inputs of the instruments will be proceed
| |
| * '''Post-analysis''' Guide the user along the setup of a pos-processing analysis/recording. The recorded/imported raw data will be proceed
| |
|
| |
| [[Image:Project_Manager_User_Pref2_58.png|framed|none]]
| |
|
| |
| * '''Name: '''It is necessary to enter a name that is not already used in the project base. The name "Default project" is also not allowed.
| |
| * '''Workbook'''
| |
| * '''Default:''' All the analyzer settings are set to default and all the windows are closed. The project created will be completely empty.
| |
| * '''Current:''' The new project is created using the current workbook settings. It is similar to the "Save As" command
| |
| * '''Model:''' The new project is created using the settings of a model workbook. It is equivalent to creating the project from an empty workbook and then loading a specific workbook
| |
|
| |
|
| =====Remove project===== | | =====Remove project===== |