Difference between revisions of "NVGate BatchPostProcess tool"

Jump to navigation Jump to search
no edit summary
 
Line 46: Line 46:


The batch post process is waiting for "FTT STOP" before loading a new signal. If you are doing only recording, the  bypass will be to add one channel into the "FFT plug in" for having the "STOP".
The batch post process is waiting for "FTT STOP" before loading a new signal. If you are doing only recording, the  bypass will be to add one channel into the "FFT plug in" for having the "STOP".
==Change log==
V2.8
New options :
"Apply input" ==> if you change the label, sensitivity (...) of a tack, this will also apply to all the other signal.
"Macro BPP"  ==> Macro "Batch Post Process". At the end of the batch post process , a "BPP" macro will be run. So rename the macro than you want to use with the name "BPP"


==Notes==
==Notes==

Navigation menu