NVGate Ribbons: Data

From OROS Wiki
Jump to navigation Jump to search

Data tab 2022.PNG

This tab provides functions to deal all your data, transfer Projects, Measurements, Models, export and import your data, filter the Project Manager.

Start

Start 2022.PNG Start…: Opens the NVGate start dialog which is dedicated to make the first steps in the software. The NVGate start dialog is also displayed at each NVGate Start, except if the user checks the option Do not show again" in the dialog.

While launching NVGate or click on this button, operator is invited to select or create a project. This step allows reloading or defining the context.

Start window 2022.PNG


Open Project

Selecting Open project opens the Open Project dialog which behaves as the single Item selection.

V10 release 16.png


Select your project and click Open button.

New Project

Selecting New project opens the following dialog:

V10 release 17.png


Fulfill the necessary properties and comment to describe the context of this project and click on OK button. This bring you to the setup selection.

Dataset

Data dataset 2022.PNG

Collate 2022.PNG Collate: Enable to copy or move Projects / Measurements / Models from a specified source to the current Projects database.
Share 2022.PNG Share: Enable to copy or move Projects / Measurements / Models from the current Projects database to a specified target.


See Share and collect dataset for details.

Import 2022.PNG Import: Import Signals and/or results files. See Export/import for details.


Projects

Data projects 2022.PNG

Data filter projects 2022.PNG Filter projects: Open the Filter projects dialog, which allows selecting the projects to be visible in the Project Manager.
Data edit measurement 2022.PNG Edit measurement: Allow reviewing the measurements for comparison, modification or report. An edited measurement comes as a foreground layer on the top of the current analysis one. See edit measurement for details.


Disk

PC and Mobi-Disc management tools

Data Disk group 2022.PNG

Reports Tools Ribbons 242.png Active Disk: Select the active disk. The active disk is the one which is mapped by the project manager. The disk where a signal file is located must be the active one in order to load it on the player (play back, post-process, exploration).

The active disk can be:

Reports Tools Ribbons 243.png The PC one. Available in office mode only.
Reports Tools Ribbons 244.jpg One of the Mobi-disk connected through a USB cable. Available in office mode only.
Reports Tools Ribbons 245.jpg The Analyzer disk (Mobi-Disk or fixed). Available in connected mode only.

Data manage 2022.PNG Manage: Open the disk manager in order to manage the signal files saved on it.
Data format 2022.PNG Format: Format the active disk. Not available when PC disk is selected.

Warning: all saved data on the formatted disk will be definitely deleted.

Data download 2022.PNG Download: Select available signal file on the active disk that match the project present on the project manager. To recover signal files from a record session made with another PC use the manage button.


OR10 setup

Data OR10 setup.PNG

Data OR10 add current.PNG Add current: Add the current setup to the OR10 or generate a file to be copied on the OR10 µSD card.
Data OR10 list.PNG List: Open the OR10 templates management dialog, which lists all the setups available on the OR10.


D-rec

This group manages D-rec (Direct recording) setups. D-rec allows recording signals with the analyzer without any PC or connection.

Data D rec setup 2022.PNG

Data new d rec.PNG New: Propose a set of dialog boxes that guide the user through the necessary settings to build a D-rec setup.
Data list d rec.PNG List: Open the Record setup management dialog which allows managing the setups saved in the analyzer. The D-rec setups can be written, removed, imported and exported from this dialog.


Read D-rec dedicated page for details.