1,042
edits
Line 47: | Line 47: | ||
A Sequence is a set of acquisitions. Each acquisition is a set of setting modifications, and it is associated to a measurement. When a measurement is performed, the acquisition associated with it, is called the current acquisition and is designated by the execution pointer (yellow arrow to the left of the sequence tree). At the end of each measurement, next acquisition becomes current and is executed to prepare the next measurement. When an acquisition is executed, all settings assigned to it are applied. | A Sequence is a set of acquisitions. Each acquisition is a set of setting modifications, and it is associated to a measurement. When a measurement is performed, the acquisition associated with it, is called the current acquisition and is designated by the execution pointer (yellow arrow to the left of the sequence tree). At the end of each measurement, next acquisition becomes current and is executed to prepare the next measurement. When an acquisition is executed, all settings assigned to it are applied. | ||
* '''Delete''': Deletes the selected acquisition. | |||
* '''Properties''': Edits sequence properties. | |||
[[Image:Reports_Tools_Ribbons_130.png]] | |||
When "Run after setup" is checked, a new measurement is launched automatically after the current acquisition is executed. | |||
Line 67: | Line 73: | ||
* '''Jump to''': Accessible by right-clicking on the acquisition. This acquisition becomes current. | * '''Jump to''': Accessible by right-clicking on the acquisition. This acquisition becomes current. | ||
===Source format=== | ===Source format=== |