Difference between revisions of "NVGate Waterfall"

Jump to navigation Jump to search
2 bytes added ,  08:53, 14 February 2022
Line 691: Line 691:
With classical tach:
With classical tach:
The RPM is collected at the end of the analysis block.
The RPM is collected at the end of the analysis block.
[[File:center.PNG|500px]]
[[File:center.PNG|500px]]


This situation leads to an offset in the waterfall calculation of the orders (cursors, sections). For a run up, as the angular speed is over evaluated, the order calculation is lower than the actual ones.
This situation leads to an offset in the waterfall calculation of the orders (cursors, sections). For a run up, as the angular speed is over evaluated, the order calculation is lower than the actual ones.




With centered tach:
With centered tach:
The RPM is calculated as the average speed during the block duration to be synchronized with the analyzed data.
The RPM is calculated as the average speed during the block duration to be synchronized with the analyzed data.
[[File:ord_tach.PNG|500px]]
[[File:ord_tach.PNG|500px]]


Line 713: Line 714:
3. Display the waterfall,
3. Display the waterfall,
4. Select the Plug-in Tach, as a tachometer and reference
4. Select the Plug-in Tach, as a tachometer and reference
[[File:fft_tach.PNG|400px]]
[[File:fft_tach.PNG|400px]]

Navigation menu